Project Details
Project Informations
We carried out the fabrication and installation of a complete water transfer piping system designed to support industrial-level demand. The work included pipe routing, pipe support fabrication, installation of control valves, strainers, and monitoring gauges. All materials were selected for durability and high pressure resistance.
Rafique Industries
Water Transfer Pump Room Setup
January 2024
Sharjah, UAE
The project involved the installation of high-capacity booster pumps and circulation pumps configured to ensure a stable flow rate throughout the facility. Our team completed motor alignment, baseframe fixing, pump testing, and connection to the existing control panel. The system was designed to enhance water efficiency and minimize downtime during industrial operations.
Knowledge & Experience
Executed by experienced mechanical and piping engineers.
Customer Focused
Delivered according to the client’s operational requirements.
Quality sub-trades
Used high-grade pumps, valves, and stainless-steel fittings.
A full hydrostatic test and leak inspection were conducted to confirm system integrity. We also provided detailed training to the client’s technical team on pump operation, preventive maintenance schedules, and emergency troubleshooting procedures. The final setup significantly improved the plant’s production workflow.